Minor Delays Expected in Lavington and Burrows Road for Monday Commute

Monday Morning Commute Overview
For Monday, 16 February 2026, commuters in Albury should prepare for a mix of ongoing local infrastructure projects and recent changes to the public transport network. While major arteries like the Hume Highway remain clear within the city limits, several suburban routes and regional connections are experiencing modified traffic patterns that could add a few minutes to your morning travel.
Local Roadworks and Active Construction Sites
Motorists are advised to be mindful of several active work zones across the city today:
- Lavington Drainage Reconstruction: Efforts continue on the drainage network between Boronia Street and Tamarind Street. While residential access is being maintained, through traffic should expect minor delays as crews progress with demolition and shotcrete application near the rail corridor.
- Burrows Road: Reconstruction and water main installations are currently underway. Commuters should expect heavy machinery in the area and temporary traffic control measures. It is advised to use alternate routes where possible to avoid congestion during peak school drop-off times.
- Thurgoona Link Road: Stage 5 construction remains active near Kerr Road. Speed restrictions are in place to ensure the safety of road crews as this project nears its final phases.
- Australia Park: The construction of the new levee and carpark is ongoing. Visitors to the riverfront or nearby facilities should watch for a high volume of heavy construction vehicles and restricted parking in the immediate vicinity.
Public Transport and Rail Reminders
Commuters using the Albury Line are reminded that a significant timetable update came into effect on 1 February 2026. This "Big Switch" network change has altered several arrival and departure times for services connecting Albury-Wodonga with Melbourne. If you have not traveled by rail this month, please verify your schedule via the V/Line app, as some services now depart earlier than previously scheduled.
For those heading toward Sydney, be aware that Sydney Trains will begin nightly maintenance works between Central and Hornsby starting tonight, Monday, 16 February. While these works take place from 10:00 PM to 4:00 AM and should not affect the daytime XPT services, late-night regional travelers should be prepared for potential noise and platform changes at the Sydney end of the line.
Regional and Evening Alerts
In the wider region, the Snowy Mountains Highway was subject to a rolling road closure early this morning for the delivery of a large Snowy 2.0 component. This operation was scheduled to conclude by 4:00 AM, but residual heavy vehicle traffic may still be present on the route toward Lobs Hole.
Finally, a reminder that an Albury City Council meeting is scheduled for 6:00 PM this evening at the Council Chambers on Kiewa Street. Expect slightly higher demand for street parking and increased pedestrian activity around the 500-block of Kiewa Street during the late afternoon.

Tech Skills, Youth Art, and Trivia: What’s On in Albury This Tuesday

Border City Buzz: Growth, Giving, and Glowing Gardens

Commuter Alert: Roadworks Continue on Burrows Road and Lavington for Tuesday Commute
